Sand Making Production Line

Whether in Sand Making Production Line or Stone Production Line, our aim is to ensure that the impact crusher can normal operating, in order to extend the crusher life, it is not less process that we should do periodic maintenance to impact crusher in use. Our factory has already made a long idling to various crushers before delivery, in order to reduce fault appear in application process in the future, our customer in new machinery production operation, the worker must do comprehensive examination to impact crusher after production operation, each component tightening, belt transmission is normal, knowing lining wear, having board to cyclical and regular examination. Do At the same time, in buying impact crusher, we should know what is wearing part, because in broken process? large material will wear liner, fight back plate, during changing process must follow the principles, first open shelves, removing the attachment bolts from shelf and middle box, then unloaded with wrench twist to flip device hex head parts and then slowly open shelves. Counterattack broken plate hammer wear to certain degree should be timely adjust or change, in order to avoid fasteners with other parts of the damage, causing a greater loss. Jaw crusher and impact crusher have played an important role in the breakage in stone production line.

Before problem appears, you should do detailed check, must not carelessness, lest penny wise and pound foolish, causing can not work normally running. The machine is supplied with complete assemble, careful examination during the transport or storage process of a long time, see if the machine without damage, sliding parts whether corrosion. To determine the machine before the installation. Machine installation, after-sale identify the level, and then install the drive section as the drawings .the drive belt should be adjusted to the appropriate position, the pressure spring to be transferred to the appropriate location. Achieve a good trial run to start the load running test, not less than 8 hours continuous operation. Determination of particle size and the current output of the compliance requirements and ensure long bearing temperature must not exceed 35 C, the cone crusher working smoothly, there should not be more severe vibration, the fasteners should be secure. The point must be filled with grease lubrication. And the right operation means to carry out according to the specific stipulation. Before the function, we should give a complete inspection to all the equipments to see if there have the wearing parts in the hammer head and pray in the crushing cavity.If any, the pray should be taken out.

~

Tags: , , , ,